Fit off is the final stage where fixtures, fittings and plant are installed and connected across the site. We complete commercial fit off with precision, ensuring systems are operational, compliant and finished to project requirements.

Fit off on a commercial job means dozens of fixtures, commercial tapware, hot water plant, TMVs, accessible bathroom fittings and specialist equipment, all installed to spec and tested before practical completion.
We fit off to the fixture schedule, commission the hot water plant and TMVs, test every outlet and provide the certificates and commissioning records the certifier needs.
Accessible bathrooms to AS 1428, commercial kitchens, labs and medical fit outs all have their own requirements. We know them.
What to expect: fit off to program, commissioning records and certificates at handover, and a defects free walk through.
Yes. Commissioned, tested and certified to AS 4032.
Form 4s, gas certificates, TMV and backflow certificates and commissioning records.
Yes. To AS 1428 with the correct heights and clearances.
Everything else
Tick the work you need and tell us what's going on. We'll call you back, talk it through and give you a clear price before any work starts.
Thanks. We’ll call you back shortly to talk it through and give you a fixed price.
That didn’t send. Call us on 0428 411 487 and we’ll sort it.