Fit off plumbing is the final stage where fixtures and fittings are connected and brought into use. We complete fit off with careful installation, ensuring all fixtures are working correctly and finished to a high standard.

Fit off is the part the owner sees. Tapware, toilets, basins, showers, baths, sinks, the hot water system and the appliances, all installed straight, sealed and working.
We fit off after tiling and cabinetry, connect everything, pressure test the system and check every fixture before handover. Compliance certificates issued for plumbing and gas.
We treat fit off as the finishing trade it is. No scratched tapware, no silicone smears, no leaks found at the final inspection.
What to expect: fit off scheduled after tiling, usually one to two days for a standard home, and a walk through with the builder at the end.
After tiling and cabinetry, before handover.
Yes. Hot water, tempering valve and all fixtures.
Form 4 for plumbing and a gas compliance certificate where gas is installed.
Everything else
Tick the work you need and tell us what's going on. We'll call you back, talk it through and give you a clear price before any work starts.
Thanks. We’ll call you back shortly to talk it through and give you a fixed price.
That didn’t send. Call us on 0428 411 487 and we’ll sort it.