Rough in plumbing sets the foundation for your home’s water and drainage systems, completed before walls and finishes are installed. We carry out rough in with accurate placement, ensuring everything aligns with the build and is ready for the next stage.

Rough in is where the plumbing gets it right or gets it wrong for the life of the house. Every pipe set out to the fixture plan, every drop and penetration in the right spot, before the plasterer closes the walls.
We rough in hot and cold water, waste and vents, gas and any special runs like fridge lines or outdoor showers, all to the plans and ready for inspection.
We work with builders across the Coast and know what the inspectors look for. Rough in passed first time means the build keeps moving.
What to expect: a fixed quote from plans, rough in scheduled to the frame stage and inspection booked by us.
Once the frame is up and before plasterboard. We coordinate with the builder.
Yes. We're licensed gas fitters so gas is done at the same time.
Tell us before rough in. Changes after walls close cost a lot more.
Everything else
Tick the work you need and tell us what's going on. We'll call you back, talk it through and give you a clear price before any work starts.
Thanks. We’ll call you back shortly to talk it through and give you a fixed price.
That didn’t send. Call us on 0428 411 487 and we’ll sort it.