Rough-in is the stage where changes are cheap. After the walls are lined, moving a pipe means cutting plasterboard. Use this checklist before your plumber starts.
What rough-in means
Rough-in is the plumbing installed before walls are closed in: water lines, drains, waste pipes and any gas lines. Fixtures such as taps and toilets come later at fit-off.
Decide these before rough-in
- Exact positions of toilets, basins, showers and baths.
- Kitchen sink, dishwasher and fridge water points.
- Laundry layout, including washing machine taps.
- Number and position of outdoor taps.
- Hot water system type and location. See instant vs storage.
- Gas points for cooking, heating or an outdoor kitchen.
Future-proofing worth considering
- A capped water and drain point for a future bathroom or laundry.
- Rainwater tank connections if you plan one later.
- Extra tap points in the garden or garage.
- Space and access for a future heat pump or solar hot water. Read heat pump vs solar.
Walk the frame with your plumber
- Check fixture positions against your final plans.
- Check heights for basins, shower rose and tap outlets.
- Confirm what is behind each wall, including feature tiles and niches.
- Photograph everything before the lining goes up.
Planning a bathroom upgrade? Our bathroom renovation guide goes further.
Why Sunshine Coast builders call Allied Plumbing
Allied Plumbing holds QBCC Licence 15589829, is a member of the Master Plumbers' Association of Queensland and has 15 years of plumbing experience. Call 0428 411 487 or request a quote online. Sunshine Coast and Noosa.





